Interim building extension for the emergency department at Leipzig University Hospital

For the University Hospital Leipzig, we have implemented a turnkey, fully functional interim building extension for medical use as an emergency department. The project was complemented by a covered ambulance access area, ensuring seamless patient care.

The modular expansion was carried out as part of the first construction phase within the ONS project and stands out with its state-of-the-art construction, installations, and equipment. Successfully commissioned before the start of the second construction phase, the interim facility serves as a fully integrated solution for the University Hospital Leipzig during the transition period.

Another testament to our expertise in delivering functional and high-quality construction projects in the medical sector.

Other Projects
    Retsch GmbH, Haan
    Construction of a commercial hall with administrative offices 2011/2012 – Plenty of Space for Innovation: The new headquarters of th
    Sky Office Düsseldorf
    ChatGPT Construction of a 89 meter high-rise building Location: Düsseldorf Client: ORCO Group Germany Contractor: Hochtief AG
    Innovative TinyStudio-Lab
    For the Frankfurt University of Applied Sciences (Faculty of Architecture, Civil Engineering, and Geomatics), we have developed a groundbrea