German Telekom Bonn

Construction of a new parking garage with approximately 630 parking spaces

2011/2012 – Highspeed in Construction:

At the main administration of Deutsche Telekom AG, the new employee parking garage with approximately 17,000 m² of space is now available for use after only six months of construction. The project’s success in every phase was ensured through a short construction time, effective cost control, and strict monitoring of high-quality standards. This project was managed by Goldbeck-West GmbH.

Location: Bonn

Client: Deutsche Telekom AG

UHB assignment: Construction management and documentation of the entire project for Goldbeck West

Other Projects
    Sana Hospital Benrath
    Renovation and expansion of a sterile goods supply facility 2012 – Operational Stability: The central sterilization unit at Benrath
    Nordbahntrasse Wuppertal
    Conversion of the former railway track into a bicycle and walking path 2010 – A lot of light at the end of many tunnels: Some sectio
    Orthopedic Clinic – Schwarzenbruck
    Sana Clinic Rummelsberger Anstalten Location: Schwarzenbruck near Nuremberg Client: Krankenhaus Rummelsberg gGmbH UHB assignment: F